Planning permission secured for new Orangery at Brownsover Hall Hotel
On behalf of our Client, SF Planning has secured planning permission from Rugby Borough Council, for a new Orangery at Brownsover Hall Hotel in Rugby, Warwickshire. The proposed building will replace an existing temporary marquee with a permanent events space, alongside improvements to the hotel’s historic walled garden.
The project will allow the established hotel business to continue hosting weddings, conferences and other events while making much better use of its historic grounds.
Finding the right solution for an important heritage site
Celebrated architect Sir George Gilbert Scott designed Brownsover Hall, a Grade II* listed Victorian Gothic mansion. The site includes several listed buildings / structures and sits within the Brownsover Conservation Area.
Heritage considerations were central to this application. The existing marquee has temporary planning permission but must be removed by January 2028. The hotel needed a permanent replacement that would support its events business without compromising the character of the estate.
During pre-application discussions, the Council raised concerns about the impact of the Orangery on the setting of the Hall and advised that alternative locations should be explored.
The final proposals respond to this advice, and the new Orangery will sit within the existing walled garden, towards its eastern boundary to retain a greater sense of openness around the main hall.
The design takes inspiration from traditional glasshouses, with an ornate steel frame, extensive glazing and a standing seam roof. It will accommodate up to 90 guests.
The wider scheme will also restore the walled garden, introducing formal planting beds, defined pathways and areas for growing produce for the hotel. Repairs to the historic brick walls will form part of the works. The existing marquee will be removed and its location returned to landscaped garden.
Supporting the future of the hotel
A key part of the planning case was demonstrating the importance of the development to the hotel’s long-term economic viability.
The temporary marquee currently provides facilities for larger events that the hotel cannot accommodate elsewhere on site. Without these facilities, the business would face a significant viability problem.
The economic assessment submitted with the application demonstrated just how important a permanent event space is for the business. It estimated that losing the marquee could result in significant annual losses. By comparison, it projected that the orangery would generate a healthy operating profit for the business once operational.
In addition, the development could create an estimated 15 permanent jobs and support local businesses involved in the events and hospitality sectors.
Crucially, the additional income will help fund the ongoing maintenance and conservation of the historic estate.
Addressing the planning considerations
The application included a comprehensive package of technical information: a Heritage Impact Assessment, Economic Impact Statement, Noise Assessment, Transport Statement, Ecological Appraisal and Biodiversity Net Gain appraisal.
The heritage assessment concluded that the proposals would result in negligible change to the significance of the heritage assets, with no substantial, or less than substantial harm identified.
The scheme will retain the existing access and parking arrangements and should not materially increase vehicle movements. Noise assessments also identified a low likelihood of adverse effects on neighbouring properties.
The scheme will deliver a significant improvement to on-site biodiversity, exceeding the statutory BNG requirement.
The permission means that Brownsover Hall can now invest in its events business while bringing an underused part of the estate back into active use.
It also demonstrates how new development can support the long-term future of a heritage asset when the location, design and wider economic benefits are properly considered.
For more information about this project to secure planning permission for the Brownsover Hall orangery, please contact Paul Jenkins.
Thanks to the following for their support with this application
Get in Touch
SF Planning provides frank and responsible advice and assistance on a variety of planning matters. Get in touch to see how we can help with your project.
e: info@sfplanning.co.uk
t: Cheltenham: 01242 231575 | Gloucester: 01452 527997 | London: 020 3763 8005
SF Planning – What we do